Project Photos

Newly installed guiderail
Preparing to remove the TCB pins
Preparing to remove TCB pins
Removing the TCB pin
Relocating the TCB
Excavator moving the TCB
Preparing to relocate the attenuator
Close-up, line obliteration
Cleaning the bridge prior to line painting
Overview, curb and gutter paving
Using the loader to place asphalt into the paver
Close-up, placing asphalt in the paver
Placing asphalt over the caisson
Using the steel drum roller on placed asphalt
Placing asphalt over installed caisson
Spreading the asphalt
Paving the shoulder for curb and gutter
Shoulder paving
Paving the shoulder
Tamping newly placed asphalt
Newly paved shoulder, steel drum roller
Using steel drum roller on newly placed asphalt
Paving shoulder, steel drum roller
Using the loader to place asphalt into the paver
Asphalt curb placement
Placing asphalt curb
Placing TCB for guiderail installation
Installing TCB for guiderail installation
Moving meter bags for dock expansion
Delivering a load of shot rock for the dock expansion
Compaction testing on newly placed crane pad
Cut deck for removal for caisson installation

View Archived Project Photos (by month)

February 2023
January 2023

  • 2022 – Archived
  • 2021 – Archived
  • 2020 – Archived
  • 2019 – Archived
  • 2018 – Archived

Copyright © 2023 Bay of Quinte Skyway Bridge Rehabilitation. All Rights Reserved.
Catch Base Pro by Catch Themes
Scroll Up
  • Project Overview
  • Lane Closures
    • Notifications
  • Project Photos
  • Schedule
  • Map
  • FAQs
  • Contact Us
  • Useful Links
  • Home
Scroll Up