June 2022

Girder Lift – Video

Installing girder bracing, piers 14-15
Delivering more girder sections
110 and 160-ton crane moving the section of girder
Using the crane to offload the girder
South abutment ballast wall rebar
Installing ballast wall formwork
Ballast wall formwork installation
Pier base 10
Concrete removals, pier base 12
Pier base 10 formwork
Manulift and concrete hopper, pier base 10 placement
Preparing for concrete placement
Vibrating the newly placed concrete
Pier 9 scaffolding
Loading removed scaffolding onto the truck with the telehandler
Moving the barges
Using the telehandler to move the spreader bar
Lowering the Crosby Clamps to the girder
Spreader bars, Crosby Clamps
Removing the restraints from the girder
Starting to lift the girder
Third girder being installed, mid-lift
Positioning the girder for installation
Installing the bolts in the splice plate
Lowering the diaphragm for installation
Moving the girder into place
Using the telehandler to lower the clamps for installation
Girders to be installed from piers 15-16
Next section of girder to be installed from pier 15-16, installed girder piers 14-15
Moving the 160-ton crane into place for girder erection
Loading the bracing on the manlift to be installed
Expanded view of the first of two girders from pier 15-16
View east of the third girder being lifted
Close-up second girder mid-lift, pier 15 end
Moving the girder into place, pier 15
Installing the second girder, piers 15-16
Installing the diaphragm
Installing the "K" frame
Starting to lift the second girder from piers 15-16
Second girder mid-lift
Preparing to lift and drop-in the second girder
Expanded view of the second girder installation, piers 15-16
Final sections of girder being delivered
Releasing the restraints to remove the girders from the truck
Attaching the Crosby Clamps to the girders
Using the 110 and 160-ton cranes to remove the girders from the truck
Girders removed from the truck and being lowered
Placing mats to lower the girders onto
Starting to install the false decking
Lowering the Crosby Clamps to the girders
Removing the girders from the truck
Both 110 and 160 ton cranes connected to the girder to be installed, pier 16 - south abutment
Starting to move the girder into place
Girder Installation
Preparing to lower the girder into place
First of two girders installed pier 16 - south abutment
View from below of girder installation pier 16 - south abutment
Installing bracing between the existing girder and the new girder
Lowering the k-frame for installation
Lifting the girder to be lowered into place
View from below, preparing to lower the girder
Starting to lower the girder into place
Installing the bolts in the splice plate on the final girder
Starting to lift the second last girder from pier 16 - south abutment
110 and 160-ton cranes lifting the second last girder
Installing the girder
Starting to lift the final girder into place
Expanded view of the final girder installation
110 and 160-ton cranes lifting the final girder
Lowering the final girder into place
Preparing for the pier 9 concrete placement
Backing in the concrete truck, telehandler
Filling the concrete hopper for pier 9 placement
Using the Manulift at pier 9 to remove the hopper from the boat
View from below of installed bracing, pier 16 - south abutment
Top view from of segment E stage 1B installed girders
View north, south abutment and installed girders
Pier 2 concrete removals
Pier 2 concrete removals
Concrete removals on pier 2
Pier 2 overview
Cleaning the removed barge sections
Manulift removing materials from the boat
Manulift lowering materials to the barge
Pier 9 formwork
Manulift, lifting the concrete hose
Pier 9 concrete placement
Newly placed concrete on pier 9
Lifting the work platform brackets to the deck
Starting the deck formwork
View south of the start of the bridge formwork and installed girders
110-ton crane lifting materials to the bridge deck
Expanded  view of the work platform brackets being lifted to be installed
View north of bridge deck formwork construction
110-ton crane lowering the work platform bracket for installation, using the manlift for installation
Telehandler delivering the work platform brackets
Top view of bracket being lowered into place with the 110-ton crane
Expanded view of work platform installation
Top view of installed work platform brackets
Using the telehandler to move lumber
Preparing to lift lumber with the 110-ton crane
Lumber mid-lift
Using the manlift to install the work platform brackets
View from below, bracket installation, lowering lumber to the deck
Preparing the formwork
Welding the Nelson Studs
Building the deck formwork
Installed work platform brackets
Building the deck formwork
View from below, installed work platform brackets
Using the 110-ton crane to load barge sections onto the truck
Unloading granular for the south abutment
Look from below of the bracket installation
View from below of installed work platform
Installed section of deck formwork
Lowering formwork to the deck
Lowering lumber to the deck for formwork
Deck formwork, work platform
View north, deck formwork
Excavator lifting the retaining wall section
Lowering soil containment wall sections
South abutment, retaining wall installation
Granular installed on south abutment
Granular placement at the south abutment
Compacting newly placed granular
160-ton crane lifting the water tote to the deck
Lowering the water tote to the deck
110-ton crane lifting the rebar to the deck
Lowering the rebar to the deck
Close-up 160-ton crane lifting the bracket to the deck
Lowering the work platform bracket to be installed
Close-up lowering bracket for installation
Building the work platform fence
Starting to install the rebar on the deck
Tying the rebar
Rebar and formwork installation
Preparing for rebar installation
Installed rebar
Close-up lowering lumber to the deck
110-ton crane lifting rebar to the deck
Lowering formwork lumber
Installing work platform bracket
Welding the girder to the bearings
Removing the whaler beam for protection system
Preparing to lift rebar with the 110-ton crane
Tightening the interior and exterior brackets
110-ton crane lifting the rebar for deck placement
Deck formwork near the south abutment
Lowering the interior bracket for installation
160-ton crane lifting the debris bucket, manlift used to tighten the brackets
Welding the girder to the bearing at the south abutment
South abutment
Starting to prepare the concrete finisher for deck placement
Preparing the concrete finisher for deck placement
South abutment, lifting lumber to the deck for formwork installation
South abutment, work platform
Installed interior brackets
110-ton crane lift supplies / equipment to the deck
East side of the bridge, segment E, 110 and 160-ton cranes
Preparing to remove the H-pile
Cutting the H-pile for removal
160-ton crane removing the H-pile
Lowering the H-pile
Lowering the second H-pile section
Using the 110-ton crane to lower the deck drain
Close-up, lowering the deck drain
Installed deck drain
Installing containment netting
View south of deck rebar
View north of deck rebar
Screed rail, to be installed
Installing work platform railing and containment netting
Hooking the 110-ton crane to the rebar to be lifted to the deck
Lifting the rebar to the bridge deck
Lowering the torches to the deck
110-ton crane removing the generator from the deck

For more information or to be added to our contact list please contact us.

Copyright © 2023 Bay of Quinte Skyway Bridge Rehabilitation. All Rights Reserved.
Catch Base Pro by Catch Themes
Scroll Up
  • Project Overview
  • Lane Closures
    • Notifications
  • Project Photos
  • Schedule
  • Map
  • FAQs
  • Contact Us
  • Useful Links
  • Home
Scroll Up